References

 

Adriatic Slovenica

Adriatic Slovenica (SharePoint 2016)

  • Development of purpose-built solutions, such as newsletter for SharePoint, overview and confirmation of conference room reservations, which includes checking of repeating events, overview and confirmation of holiday facility reservations, SharePoint notification center, which collects comments on the SharePoint portalu (similar to Facebook), HelpDesk ...
  • Complete development of the intranet portal, including the migration of content from the old Liferay portal to SharePoint, which includes an addition navigation in the header, keyvisual, megamenu and other custom web parts in the masterpage.

Kolektor

Intranet development

We developed a complete intranet portal on the SharePoint platform, which includes an additional header navigation, keyvisual and other custom web parts in the master page. We also developed various web templates for subsidiaries and teams.

 

Cinkarna Celje

Implementation of a documentation system

 

Elektro Maribor

Upgrading SharePoint 2010 to SharePoint 2016

 

Agencija za energijo

Intranet Portal Development on the SharePoint 2016 Platform

We developed two intranet portals for the client, including the page matrix. The site also contains a page for Business Intelligence (BI) nad content transfer. We also developed an interface for publishing news and photographs, which are displayed in the form of a gallery. The project included developing webparts for displaying documents, employees, ... At the end of the project, we trained editors and administrators in the usage of the intranet portal.

Year 2017 / 2018

Optotek

Expansion of the IT system

We supplied the customer with hardware and software.

We implemented and configured a backup system and an additional mail server.

Employment Office of the Republic of Slovenia

Employment Rehabilitation

We developed an application that enables data exchange between the Employment Office of the Republic of Slovenia and contractors of employment rehabilitation.

The goal of the project was the informatization rehabilitation completion report and included everything from studying the client's requirements, design overhaul, developing the solution, testing the solution and installing it on the client's server.

Year 2017

 

Banka Slovenije (Bank of Slovenia)

Webpage redesign and development

The project included preparing a graphical design for the new webpage, transferring content from the old page to the new one and implementing all the requested functionalities of the webpage.

The interface, used for editing content on the webpage (CMS) is the product of our own development and includes all the necessary functionalities: user administration, content editing, multilingualism, breadcrumbs, ...  According to the wishes of the client, we also developed additional functionalities and adjusted the existing ones.

Year 2017

Elektro Gorenjska

Installing SharePoint Server

We installed and configured SharePoint Server and took care of branding.

Year - 2017

Trivandi Chanzo, Great Britain

5th Asian Indoor and Martial Arts Games, Ashgabat 2017, Turkmenistan

Our team was entrusted with the difficult position of Technical Manager. Their responsibility was the management of the entire Microsoft infrastructure, that was necessary for the smooth operation of the games. Work was carried out from November 2016 until the end of the games in September 2017.

Besides our system engineers, who made sure that the infrastructure was secure and operating smoothly, two of our coworkers were given the role of helpdesk specialists. They were on-site for two months and made sure that the day-to-day issues of end users were resolved quickly.

Year 2016 / 2017

 

AJPES

Upgrading SharePoint 2010 to SharePoint 2016

We upgraded the client's intranet portal from SharePoint 2010 to SharePoint 2016 with an intermediate upgrade to SharePoint 2013. During the upgrade we also migrated content from the old portal to the new one.

Year - 2017

Sava Insurance Company

Migration of e-mail to Office 365

We migrated e-mail to Office 365 and provided assistance with the migration of mailboxes.

Year 2017

Eurodesign for the Ministry of Youth and Sports of Azerbaijan

Ministry of Youth and Sports Azerbaijan

In association with our partner Eurodesign from Azerbaijan, we were selected, despite tough competition, for the redesign and development of the website for the Ministry of Youth and Sports of Azerbaijan.

The project included the creation of a design template, that meets the current trends in web design, including support for mobile devices, the implementation of a content management system, which is the result of our own development and some other functionalities, such as an advanced contact form, reporting, rights-based CMS access, multilingualism, gallery, timer, ...

Year 2016 / 2017

http://mys.gov.az/en 

Eurodesign, Azerbaijan

4th Islamic Solidarity Games

Development of the website for the 4th Islamic Solidarity Games, Baku 2017, based on a specified graphical design.

Implementation of a content management system (CMS) and functionalities such as multilingualism, a gallery, social media integration, timer, ...

In the second phase of the project, we created a new design for the webpage and implemented a so called slider and some other advanced functionalities (news, video content, "Join us", "Call to action", ...).

For better scalability, the site is hosted on Microsoft Azure.

Year 2016 / 2017

http://www.baku2017.com/

Pošta Slovenije (Slovene National Post)

Renovation of the application for delivering unaddressed direct mail

We developed a web application for unaddressed direct mail delivery, through which customers get an informative offer and prepare distribution lists, which the post office then uses to distribute the mail.

Year 2016

Ministry of Science, Education and Sport

Upgrading SharePoint from 2010 to 2016

Upgrading SharePoint from 2010 to 2016 in a test and production environment.

Upgrade and customization of solutions decicated to:

  • Monitoring travel expenses.
  • HelpDesk requests.
  • Hardware rental.

As part of the portal implementation, a master page was created based on the client's corporate identity.

Employment Office of the Republic of Slovenia

Upgrading from SharePoint 2007 to 2016

The ultimate goal of the project was to upgrade the existing intranet portal from SharePoint 2007 to 2016. Because a direct upgrade from 2007 to 2016 is not possible, a temporary SharePoint 2010 and SharePoint 2013 setup was required. Both were used to adjust the database structure.

As part of the upgrade, we also created a master page and display templates used for showing news on the intranet landing page and for viewing individual news. We also assisted the client with reorganizing content and trained the users of the portal.

Year 2016

The Agency for Energy

Implementing SharePoint 2016

We implemented a SharePoint 2016 infrastructure into separate domain environments in order to provide business intelligence and support intranet.

Year 2016 

Kapitalska družba

Setting up the SharePoint portal and developing additional functionalities

We set up a SharePoint 2010 portal and developed functionalities for logging metadata for documents by using document sets.

Year - 2016

Gorenje surovina d.d.

Migration to SharePoint Online

We migrated the client's SharePoint on-prem environment to SharePoint Online and developed some additional functionalities.

Year - 2016

Trimo d.d.

Upgrade of existing SharePoint functionalities

We upgraded the existing SharePoint functionalities to include entry and editing of references shown on the webpage.

Year - 2016

Elektro Celje

SharePoint upgrade

We upgraded their existing portal to SharePoint 2013, which included preparing the environment for connecting to Microsoft Project Server and migrating lots of custom solutions.

Year - 2016 

Slovene Chamber of Pharmacy

Upgrading the IT system

The project consisted of upgrading the information system, supplying the customer with hardware and software, implementing and configuring Exchange and SharePoint servers and regular maintenance.

Mladinska Knjiga Publishing House JSC

Upgrading from SharePoint 2010 to 2013

We implemented and configured a SharePoint 2013 server that included SP1 and the latest patches. The implementation and configuration process took into account best practices, such as creating a connection with AD, configuring search, configuring services and configuring the proper authentication methods. We also provided the client with technical documentation.

We created a master page in accordance with the client's corporate identity.

Year 2016 

Visit Ltd.

Website Development

We overhauled the corporate website the company uses to present its services and solutions.

To edit the content of the website, the client now uses a CMS that is the product of our own development.

www.visit.si

Year 2016 

Actual I.T. JSC

Upgrading from SharePoint 2007 to 2013

We implemented an intranet portal on the SharePoint 2013 platform and migrated all content from the SharePoint 2007 portal. A test and production environment was created.

We created a master page in accordance with the client's corporate identity.

We also developed some custom solutions to support the client's business processes, such as:

  • Vacations and training.
  • Sick leave.
  • Delegation of work to the legal department.
  • Phone book.
  • News.

Year 2015 / 2016 

Electrotechnical Association of Slovenia

EZS Glossary

We developed and online glossary for technical terminology with the option of importing and editing terminology. It also enables adding and editing comments.

www.eglosar.si

Year 2016 

Eurodesign, Azerbaijan

Website for the Formula 1 race in Baku

The development of the Baku City Circuit webpage was one of Kompas Xnet's highlights of the years 2015 and 2016. The project included the development of the page and two phases of functional upgrades.

The website used Windows Azure, which enabled the website to be properly configured for the massive increase in traffic on the page during the time of the race.

The website was awarded with the NETTY award in 2016 in the category of best sports website.

http://www.bakucitycircuit.com

Year 2015 / 2016

Salus JSC

Implementation of a SharePoint 2013 Intranet Portal

We created an internal portal on the SharePoint 2013 platform, with a special emphasis on a site that management uses to monitor reports in the form of Excel tables.

Besides these reports, we also developed some additional features that were not available Out of the Box.

Doba

CMS development

Development of a CMS for managing session content of speakers on SharePoint 2013.

Year - 2015

Microsoft for the Ministry of Public Administration

SharePoint portal

We made a pilot implementation of an intranet portal on SharePoint 2013. The portal mostly included OOTB functionalities but also included some custom development. We also assisted the client with consultations.

Year - 2015

ProNid

Tracking KPIs and other indicators

For a foreign client, we implemented KPI and other indicator tracking. It required connecting 3 different platforms: SharePoint Online, used to enter data and lookup tables, Azure, which is used for storage and Power BI, where reports are made.

Year - 2015

Savske elektrarne

SEL

Installation, configuration and customization of SharePoint 2013.

Year - 2015

Eurodesign for BEGOC, Azerbaijan

1st European Games - Baku 2015

In the middle of October 2014, we were entrusted with a difficult role in the 1st European Games, that took place between the 12th and 28th of June 2015 in Baku, Azerbaijan.

Our team of experts worked as Level 3 engineers, responsible for the smooth operation of Exchange, Active Directory, SQL, SharePoint, Lync and Office 365.

Year 2014 / 2015

Optotek

Upgrading the IT system

We upgraded the company's IT system, which included virtualizing the environment, implementing an Exchange Server, antivirus protection, a backup system and regular maintenance.

Year 2015

Studio Moderna

Implementing an Exchange server

We implemented an Exchange server for 7000 users.

Year 2015

Studio Moderna

Implementation of Skype for Business

We implemented and configured Skype for Business for 7000 users.

Krka JSC

Upgrading SharePoint from 2007 to 2013

We implemented and configured SharePoint 2013 and upgraded and migrated content and custom solutions from SharePoint 2007.

We created a master page based on the client's corporate identity.
We created all the necessary documentation and trained editors.

Extranet:

  • The implementation of a test and production environment.
  • Upgrade of the production environment (content migration).
  • Branding (master pages, page layouts).
  • Display of the headline websites web part.
  • Password web part.
  • Testing and transfer into production.

Intranet:

  • The implementation of a test and production and environment.
  • Upgrade of the test environment (content migration).
  • Upgrade of the production environment (content migration).
  • Creation of site definitions.
  • Creation of site templates.
  • Creation of list definitions.
  • Creation of content types.
  • Development of web parts.
  • Development of controls.
  • Development of features.
  • Branding (master page, themes).

Since the handover in 2015 we have been performing regular preventive maintenance, assistance and consultations. Additionally, we have been developing further custom solutions based on the customer's specification.

Year 2013 / 2014

SharePoint Days 2014

SharePoint Days 2014 Website

We used the SharePoint 2013 platform to develop the website for the SharePoint Days 2014 conference. It included all the functionalities that a webpage for organizing this type of event needs, such as:

  • General information about the conference and it's location.
  • Registering sessions.
  • Registering sponsors.
  • The conference timetable.
  • A speakers page.
  • Surveys.
  • The option to create personalized schedules.
  • Attendee registration.
  • ...

Year 2014

Cinkarna Celje

Installing and configuring SharePoint Server

We installed and configured SharePoint Server 2013 for the client.

Year - 2014

Barbara Gunčar

Website development

We developed the www.barbaraguncar.si website for a candidate for the mayor of the city of Kranj in the local elections.

Year - 2014

Medis

Implementation and configuration of SharePoint Server

We installed and configured SharePoint Server 2013 for the client and made various other adjustments.

Year - 2014

Akrapovič d.d.

SharePoint services

Creation of a master page.

Year - 2014

 

Ministry of Education, Science and Sports

SharePoint services

Development of additional customizations and functionalities (order forms, travel orders ...).

Year - 2014

MMS for BTC

Adjusting the webpage for mobile

We adjusted the client's website for mobile devices.

Year - 2014

Association of Female Managers (FAM)

Website Development

We overhauled the website of the Association of Female Managers and migrated content.

www.drustvo-fam.si 

Year 2014 

Studio Moderna

Upgrading SharePoint from 2010 to 2013

We upgraded SharePoint from 2010 to 2013 and migrated all content and customized solutions.

We created a master page in accordance with the client's corporate identity.

Year 2014 

Microsoft Slovenia

NTK 2014 Website

We developed the website for the 2014 NTK conference that was hosted in Microsoft Azure. It had all the functionalities of previous websites in addition to some new ones:

  • Registration system, which enabled registration and purchase of tickets. One system covered 3 different types of registration.
  • Integration with the provider of SMS services.
  • Mobile device compatibility.
  • Application for distributing conference materials to attendees.
  • VIP addressing tool.

Year 2013 / 2014 

BTC JSC

Save the Bees

We developed an application to support the Čebela (Bee) project, which brought together various merchants with the aim of promoting and selling honey plants.

Upon purchase, each customer received a code which he could use to register online and view the location of his honey plant on a map.

The application was set up on btc-city.com

www.ohranimo-cebele.si

Year 2014 

University of Ljubljana

Upgrading SharePoint from 2010 to 2013

We upgraded SharePoint Server 2010 to SharePoint Server 2013 and migrated content. We also created a master page.

Year 2014

SharePoint Days 2013

SharePoint Days 2013 Website

We developed the page for the SharePoint Days 2013 conference. It included all the functionalities that a webpage for organizing this type of event needs, such as:

 

  • General information about the conference and it's location.
  • Registering sessions.
  • Registering sponsors.
  • The conference timetable.
  • A speakers page.
  • Surveys.
  • The option to create personalized schedules.
  • Attendee registration.
  • ...

Year 2013

Trimo d.d.

Installing and configuring SharePoint Server

We installed and configured SharePoint Server 2013 for our client.

Year - 2013

Akrapovič d.d.

Installing and configuring SharePoint Server

We installed and configured SharePoint Server 2013 for our client.

Year - 2013

dm-drogerie markt

Upgrading SharePoint Server

Upgrading SharePoint 2010 Foundation to SharePoint Server 2013.

Year - 2013

GEN-I d.o.o.

Jeftina struja webpage

We developed the www.jeftinastruja.hr website for our client. GEN-i uses it to market their services to businesses and household in Croatia.

Year - 2013

Sandoz

Dashboard and PPM Changes

For our client, we developed SharePoint solutions, which allow them to:

  • issue, ogranize and monitor incentives for branch offices,
  • inspect and trace the changes in their packaging and excipients in an effective manner.

Year - 2013

Hidria d.d.

SharePoint upgrade

We upgraded the client's SharePoint 2010 to SharePoint 2013.

Year - 2013

Faculty of Administration, University of Ljubljana

Migration of the Post Server

We migrated the existing Exchange 2010 server into another domain.

Year - 2013

Unicef Slovenia

Website overhaul

We redesigned and updated the website of Unicef's Slovenian branch. We adjusted it for use on mobile devices.

Since the handover in 2010, the company has been updating the website's content by itself with the help of an easy to use CMS.

We performed regular maintenance, implemented minor patches and upgrades.

Year 2013

Adria Mobil Ltd.

Upgrading from WSS 3.0 to SharePoint Foundation 2013

We upgraded from WSS 3.0 to SharePoint Foundation 2013 and migrated content.

We upgraded a custom solution for monitoring processes.

We created a master page in accordance with the client's corporate identity.

Year 2013 

Filc JSC

Implementing a Hyper-V environment

We implemented a Hyper-V server in a Windows Server 2012 environment and virtualized a Microsoft Exchange 2013 server for 100 users.

Year 2013

Malalan Jewelry

Website Development

We developed a new website based on the provided graphical design.

Year 2013 

Microsoft Slovenia

NTK 2013 Website

We developed a website that enabled people to get information about the conference, register for the conference and personalize their conference schedule. Additionally, the website displayed news, content and enabled mass mailings.

A customized CMS enabled:

  • Editing the website's content, news and conference schedule.
  • Editing of speaker pages.
  • Editing picture galleries.
  • Organizing a raffle.

 The website also included:

  • A system for communicating with the backend payment system.
  • A system for integration with the access control system.
  • Integration with the booking system of hotels.

Year 2012 /2013 

Tilia Insurance Company

Implementing and Configuring SharePoint 2013

We implemented and configured 3 SharePoint farms (test, production and QA), migrated all the databases and content.

We performed regular preventive maintenance, minor upgrades and customizations, help and consultations.

Year 2012 / 2013

Intereuropa

Implementing SharePoint 2010

We implemented and configured SharePoint 2010 with all the necessary customizations. We created a master page based on the client's corporate identity.

We created all the necessary documentation and trained the administrators and editors.

Year 2012 / 2013

SharePoint Days 2012

SharePoint Days 2012 Website

We developed the website for the SharePoint Days 2012 conference. It included all the functionalities that a webpage for organizing this type of event needs, such as:

  • General information about the conference and it's location.
  • Registering sessions.
  • Registering sponsors.
  • The conference timetable.
  • A speakers page.
  • Surveys.
  • The option to create personalized schedules.
  • Attendee registration.
  • ...

Year 2012

BTC JSC

Crystal Palace

We developed the website for the Crystal Palace, currently the tallest building in Slovenia, that offers visitors all the necessary information about events and offers.

www.kristalna-palaca.si

Year 2012 

Ministry of Education, Science, Culture and Sports

SharePoint customizations and additional functionalities

We made various customizations and developed additional functionalities for the client on SharePoint.

Year - 2012

Krka d.d.

SharePoint

Setting up a POC environment MOSS 2010.

Year - 2012

Toyota Adria Ltd.

Upgrading the IT system

The project consisted of numerous parts:

  • The implementation and configuration of the Forefront TMG server.
  • The implementation and configuration of System Center Data Protection Manager 2010 for the needs of the virtual environment security.
  • The preparation of procedures necessary for a partially automated upgrade of computers from Windows XP to Windows 7.
  • The implementation of a two level Certificate Authority environment.
  • The implementation and configuration of a Windows Server 2008 R2 for the needs of RemoteApp services.

GEN-I d.o.o.

Poceni plin website

We developed the www.poceniplin.si website, which Gen-i uses to market it's gas supply. The site is hosted on Windows Azure.

Year - 2012

InTelCom

Setting up a Hyper-V server with Windows Server 2008 R2 virtual servers

We set up a a Hyper-V server with Windows Server 2008 R2 virtual servers (AD, Exchange 2010, Forefront TMG).

Year - 2012

Elektro Celje

EC InfoPath

Customization of InfoPath forms.

Year - 2012

Microsoft Slovenia for the Ministry of Finance

Finances

We set up 4 SharePoint farms for our client.

Year - 2012

Microsoft Slovenia

NTK 2012 Website

We developed the website for the NTK conference, that included options for registering to the conference, viewing the conference schedule and other conference information. The website also included options for editing content, the conference schedule, speaker pages and sending mass mailings.

The website was developed based on the provided graphical design and a CMS for editing page content, news and the schedule. Different types of access was provided for different types of editors. Systems for sending mass mailings and for communicating with backend payment systems were also developed.

Year 2011 / 2012

Mladinska Knjiga Publishing House JSC

Development of a Portal for the Croatian Market

We developed a portal for Mladinska Knjiga Založba Croatia.

Year 2012

Banka Koper

BitLocker implementation

We implemented data encryption by using the Windows 7 built-in functionality BitLocker.

Year 2012

Kompas Xnet

BitLocker Implementation

We prepared the environment for an automated encryption of Windows 7 clients with BitLocker.

Year 2012

Mladinska Knjiga Publishing House JSC

Implementing SharePoint 2010

We implemented and configured SharePoint Server 2010 Enterprise Edition and migrated content from the existing SharePoint server.

We performed regular preventive maintenance, minor upgrades and adjustments and provided assistance to the client.

Year 2011 / 2012 

PBS - the Post Bank of Slovenia

Conclusions and recommendations

The automatic monitoring of the administration's and technical staff's conclusions and audit reports.

The implementation of changes and update of the conclusion and recommendation monitoring software.

Year 2011 / 2012

Ministry of Public Administration. Directorate of e-administration and administrative processes

E-Sociala

Customization of the URSP transaction system - adjustments to the refreshing of distribution copies of data inside the IO-module for the needs of the e-Sociala project as part of the ESS operation for interoperability and e-exchange of data.

Year - 2011

Microsoft Slovenia for GEN-i d.o.o.

PoceniElektrika.si webpage

We developed the www.pocenielektrika.si which Gen-i uses to present it's services to households and businesses. The site includes a calculator where people can make an informative calculation of their electricity costs and fill out a form to change their electricity provider. The site is hosted on Windows Azure.

Year - 2011

Microsoft Slovenia for GEN-i d.o.o.

Gen-i.eu webpage

We developed the www.gen-i.eu website. It includes a multilingual presentation of the corporation and a multilingual presentation of all branch offices in different countries. The site is hosted on Windows Azure.

Year - 2011

AJPES

IT infrastructure services

Assistance with upgrade and management of the IT infrastructure, troubleshooting.

Year - 2011

Constitutional Court of the Republic of Slovenia

Assistance with SharePoint

Intervention, assistance and consultation regarding management of SharePoint.

Year - 2011

Ministry of Internal Affairs

Upgrading SharePoint

Upgrading WSS 3.0 to SharePoint 2010 Foundation.

Year - 2011

dm-drogerie markt

SharePoint services

Implementation of Search Server Express 2010, upgrade to Windows SharePoint Services 3.0

Year - 2011

Codeplex

SP2010 ADgroupMembers

We developed a Web Part which shows active directory group members as an open-source project on Codeplex.

Year - 2011

Faculty of Administration

Migrating Exchange Server 2003 to 2010

We migrated Exchange Server and mailboxes to Exchange 2010 (for 100 users).

Year - 2011

Elkotex

Implementing a Hyper-V environment

We implemented a Hyper-V server with virtual servers and migrated the environment from a work group to a Windows 2008 R2 domain (Active Directory, Group Policy, File System, Exchange, ...).

Studio Moderna

Upgrading from SharePoint 2007 to 2010

We upgraded SharePoint from 2007 to 2010 and migrated content.

We created a master page in accordance with the client's corporate identity.

We performed regular preventive maintenance of the portal, provided assistance and consultations to the client.

Year 2011 

Faculty of Administration, University of Ljubljana

Upgrading Exchange 2003

We upgraded Exchange 2003 to Exchange 2010 and migrated the mailboxes of 100 users.

Year - 2011

Microsoft Slovenia

NTK 2011 Website

We developed the website for the 2011 NTK conference, that had its own CMS and was hosted in Microsoft Azure.

Besides containing basic information about the conference and enabling registrations, the website also enabled conference participants to create their own personalized schedule.

Year 2010 / 2011

Publicis

Development of the BTC-City Portal

In association with Publicis, we developed the webpage www.btc-city.si based on the provided graphical design.

The website for the BTC City shopping center enables people to find a list of all shops, sorted by categories, read the latest news about the shopping center and register to the centers mailing list.

The website is hosted in Microsoft Azure.

We have been taking care of regular website maintenance and have developer numerous additional functionalities and modules.

Year 2010 / 2011 

Bemada d.o.o.

Picasso website

We developed the www.picasso-turizem.si website for the Picasso restaurant and pizzeria in Banovci.

Year - 2010

SZKO

SZKO website

The Slovene Association for Quality and Excellence entrusted us with developing their website, www.szko.si, which they use to present their activities and which people can use to register for various events and trainings.

Year - 2010

Ipro d.o.o.

Contacts editor

The client wanted to have advanced options for catogirizing his contacts and sending mass mailings to selected contacts. We developed a desktop application, which allows people to filter contacts based on different categories, mass importing of contacts and exporting them to an application for sending email.

Year - 2010

Toyota-Adria d.o.o.

Toyota Portal and Forms

Implementation of SharePoint 2007 and migration of content from a subsidiary located abroad into Ljubljana.

Creation of electronic forms.

Year - 2010

Toyota Adria d.o.o.

Infrastructure services

In 2010 we performed various services for the client:

  • Virtualization of their physical infrastructure to MS Windows Server 2008 R2 with the Hyper-V role in an environment with 15 servers (100 users).
  • Migration of Exchange 2007 to Exchange 2010.
  • Installation of Exchange 2010 and migration of mailboxes from Exchange 2003 (100 users).
  • Migration and standardizing the antivirus solutions to Microsoft Forefront Client Security in a network with 100 computers.

Year - 2010

Microsoft Slovenia for Krka d.d.

KrkaNet

Training new administrators for the SharePoint Servers and editing content on the KrkaNet portal.

Year - 2010

Microsoft Slovenia for Bankart

Upgrading SharePoint 2007 to 2010

We upgraded the client's SharePoint 2007 portal to SharePoint 2010

Year - 2010

Ljubljana Puppet Theatre

Implementing a Hyper-V server and migrating the environment from Windows 2000 to Windows 2008 R2

Implementing a Hyper-V server and migrating the environment from Windows 2000 to Windows 2008 R2 (AD, GPO, data system, WSUS,...).

Year - 2010

Toyota Adria Ltd.

Kaizen

We developed a system for accepting and evaluating innovative recommendations for improvements in the company.

We developed electronic forms.

Year 2010

University of Ljubljana

Implementing an Intranet on SharePoint 2007

We implemented SharePoint 2010, developed a main portal page, that is used by all University of Ljubljana members and upgraded SharePoint from 2007.

Year 2010 

Ministry of Culture

Upgrading from WSS 3.0 to SharePoint 2010 Foundation

We performed an upgrade of the intranet portal from WSS 3.0 to SharePoint 2010 Foundation.

As part of the project, we also performed the migration and adjustment of content from Windows SharePoint Service 3.0 to SharePoint 2010 Foundation.

Year 2010

ACH JSC

Upgrading from SharePoint 2003 to 2010

 We upgraded SharePoint from 2003 to 2010, migrated and customized content.

 Year 2010 

Ministry of Culture

Upgrading WSS 3.0 to SharePoint 2010 Foundation

We implemented and configured the operating system and SQL Server.
We upgraded WSS 3.0 to SharePoint 2010 Foundation, migrated and customized content.

Year 2010

Toyota Adria Ltd.

Implementation of SharePoint 2007

We implemented and configured SharePoint 2007 and migrated content from a subsidiary based abroad into Ljubljana.

Year 2010

University of Ljubljana

Implementation of SharePoint 2010

We implemented and configured SharePoint 2010 and developed the main portal site, which is used by all of the members of the University of Ljubljana.

We developed a master page based on the client's corporate identity.

We performed regular preventive maintenance, minor upgrades and customizations, help and consultations.

Year 2010

Unicef Slovenia

Website

We developed a website for Unicef's Slovenian branch, that includes an online store, the option to make donations using various payment methods and a presentation of all Unicef activities around the world.

www.unicef.si

Year 2010

Publicis

DealerConnect

We developed an application meant for picking a color for your vessel, based on the type of vessel you have. This part of the application functions as a desktop app for touch screen devices, while the other part of the app is meant for web content administration, so the client can edit the content for all of his events from one central location.

Year - 2010

Microsoft Slovenia

NTK 2010 Website

We developed the website for the 2010 NTK conference. The website contained all the functionalities necessary for organizing a conference, such as:

  • Conference registrations.
  • An overview of speakers and sessions.
  • A conference timetable.
  • ...

For this website, we received a special recognition from Microsoft Slovenia. Additionally, Microsoft Slovenia presented the website as a case study for using Microsoft Azure technology.

Year 2009 / 2010

Toyota Adria Ltd.

Help Desk

We developed a Help Desk application on SharePoint 2007 that users can use to log request for assistance. The system informs the administrator about this new request. When the administrator resolves the issue, the application informs the user that the requests has been completed. The user can then either accept or deny the solution, of which the administrator is again informed.

Year 2009 / 2010

Ministry of Culture

Reservations

We used the SharePoint platform to implement a solution for business trips, absences from the workplace, vacations and reservations of common spaces and resources. Employees can use the portal to submit the appropriate form that their superior receives for approval. The employees are then notified of their superiors decision by email.

Year 2009

Visit d.o.o.

Website redesign

We redesigned the client's webpage www.visit.si

Year - 2009

Kapitalska družba d.d.

Spletnica

We upgraded the web parts and complemented the built-in styles for text formatting.

Year - 2009

Kompas d.d.

Migration and standardizing the antivirus solution

We migrated and standardized the antivirus solution to ESET NOD32 in a network with 400 computers.

Year - 2009

Beli Obroč Society of Slovenia

Beli Obroč

We developed the website for the Beli Obroč Society, whose mission is to help victims of criminal acts - www.beliobroc.si

We also took over the hosting and maintenance of the website.

The website was our donation to the society.

Year 2009

Kompas JSC

Traffic

We developed an application for electronic registration and monitoring of requests for transportation of passengers with buses, for viewing and processing order forms, ordering bus transportation at contractors and viewing statistics.

Year 2009

Tangram Publishing House

TouchStone

We developed an online bookstore that people can use to order textbooks from the Touchstone series.

www.touchstone.si

Year 2009

Ljubljana Puppet Theater

Puppets

We developed an application that allows the client to edit show descriptions, monitor conducted performances and view monthly reports.

Year 2008 / 2009

Kapitalska Družba JSC

Spletnica

We created a master page for SharePoint 2007 based on the client's corporate identity.

We also upgraded the existing web parts and text editing styles.

Year 2008 / 2009

Kompas d.d.

Registration of working hours

We developed an application that the client uses to register the arrivals and departures of employees and allows management to view weekly, monthly and yearly reports. Both regular working hours, as well as leave, absences and other things are monitored.

Year - 2008

Alsing d.o.o.

ArhBet

We devleoped an application that concrete plant use for analyzing data, issuing referrals and printing out monthly reports.

Year - 2008

360 ECM d.o.o.

Cost splitter

We developed an application that is part of the documentation system and allows the client to split incoming bills by individual costs, confirm and decline the splits.

Year - 2008

Kompas JSC

Tour Guides

We developed an application that enables reservation of tour guides and keeping a database of them.

Year 2007

Maritime Administration of the Republic of Slovenia

Leaders and VHF

We updated the existing Leaders and VHF application, so that it enables querying of information from Microsoft SQL Server 2005.

Year 2007

Maritime Administration of the Republic of Slovenia

Boats

We developed an application for keeping records of boats and issuing registration sheets.

Year 2006 / 2007

Kompas JSC

Transfers

We developed an application for a standardized collection of information that is later used to organize transfers and allow for a simplified overview of available vehicles.

Year 2007

Kompas JSC

Kongresi.NET

We developed an updated version of their existing Kongresi application, which we designed in .NET.

It enables the congress organizer to enter all relevant congress information, such as possible accomodations, all planned activities, prices etc. into an SQL Server database. Interested people can then register for the congress and select all the activities they are interested in.

Year 2005

Kompas JSC

Kompas Confidential Tariffs

We developed an extranet solution so that Kompas subsidiaries around the world can access a common database of hotel prices around the world. It allows for a simplified search by price. It was developed in ASP, uses a Microsoft Access 2000 database and runs on Microsoft Information Server 2000.

Year 2001

Kompas JSC

Kompas INTRA

In order to help Kompas comply with the ISO 9001 standard, we developed a modular intranet application, that offers employees a rich palette of information that they need to work efficiently.

The intranet was upgraded in 2004.

Year 2000 / 2004

Need assistance?
Need assistance?